AEROVAPE
AEROVAPE cleanroom

Factory

A vertically integrated vape factory in Shenzhen

Tooling, injection moulding, SMT assembly, filling, testing and packing run under one roof. That vertical control is how we keep 15-day lead times while holding failure rates under 0.3%.

20,000 m²

Facility area

12

Automated lines

380+

Skilled staff

30M+

Units / year

Capability

What we can do in-house

Automated Production Line

Automated Production Line

12 SMT and assembly lines with in-line AOI inspection, running 24 hours a day, six days a week.

Dust-free Cleanroom

Dust-free Cleanroom

ISO 8 filling area with laminar flow benches, controlled humidity and full batch traceability.

In-house QC Laboratory

In-house QC Laboratory

Puff testing, leak testing, battery cycling, airflow measurement and flavour consistency checks.

Export & Packaging

Export & Packaging

Retail-ready cartons, child-resistant packaging, market-specific labelling and palletising.

OEM / ODM process

From brief to bulk shipment

  1. 01

    Brief & design

    Share your market, target price and artwork. We propose the matching platform.

  2. 02

    Tooling & samples

    Housing tooling, flavour matching and sample units in 7-10 working days.

  3. 03

    Pilot run

    Small batch validation with full QC report and compliance documentation.

  4. 04

    Mass production

    Bulk manufacturing, 100% testing, export packing and shipping coordination.

Want the full factory profile and test reports?

Email test@aerovape.com and we will send the audit pack the same day.

Contact Us
Inquiry